Plant Maintenance (PM) & Calibration Dashboard
ECC T-Codes: IW38 / IP10 / IL03Pharmaceutical tablet presses, sterilizing autoclaves, cleanroom HVAC HEPA validations, and sensor calibrations.
Calibration Status:1 Urgent Calibration In-Progress
MTBF (Machine Uptime)
1,152 Hrs+48h
Between failures>800h
Mean Time to Repair
1.8 Hours-0.3h
Breakdown recovery<2.5h
Calibrations Due <7d
1 Unit+1
Getinge 2500LAutoclave
PM Adherence Rate
98.1%+0.6%
Preventive orders>95%
Autoclave Uptime
99.4%+0.2%
Terminal sterilizerNominal
Tablet Presses
4/4 Online0
Compression suitesFette Rotary
HEPA Differential
100% Green0
AHU filter integrityDP: 15-30Pa
Work Orders Open
2 Active-1
Mechanical maintenanceScheduled
Critical Cleanroom Machinery & Maintenance Orders
(4 Key Assets)| Asset Code | Equipment Name | Cleanroom Location | Maintenance Type | MTBF (Hrs) | Lead Technician | Next Calibration | Work Order Status |
|---|---|---|---|---|---|---|---|
| EQ-TAB-04 | Fette 3090i High-Speed Rotary Tablet Press | Solid Oral Suite 102 | Preventive (PM) | 720 hrs | Engr. J. Mercado | 2026-11-04 | Scheduled |
| EQ-AUT-01 | Getinge GEV Terminal Sterilizing Autoclave 2500L | Aseptic Injectable Suite A5 | Calibration Check | 1150 hrs | Calibration Specialist L. Cruz | 2026-10-24 | In Progress |
| EQ-BLS-03 | Bosch TLT 1400 Blister Packaging Line | Secondary Packaging Hall B | Preventive (PM) | 640 hrs | Engr. D. Ramos | 2026-12-15 | Completed |
| EQ-HVAC-C1 | Cleanroom AHU-09 HEPA Filter Differential Bank | Plant 1 Central HVAC Loft | HVAC Filter Validation | 2100 hrs | HVAC Lead E. Bautista | 2026-10-28 | Scheduled |